product
Roller Veneer Dryer Line-Roller Veneer Dryer Line
Roller Veneer Dryer Line-roller-veneer-dry-(2)
Roller Veneer Dryer Line-roller-veneer-dry

Roller Veneer Dryer Line

Other Name:  Core Veneer Roller Dryer Machine 

Min.Order Quantity:  1set

Port of Loading:  Qingdao/Lianyungang,China

Payment Terms:  T/T , L/C at sight.etc

Main Market:  South-east Asia(Malaysia,Indonesia,Vietnam),Russia,Africa countries (Congo,Gabon) ,etc

Product Details

     roller-veneer-dry        roller-veneer-dry-(2)



ModelHXRD-30.24 seriesBrandHAOXING
Working Width3100 mmTotal power96 kw/380V
Working Layers2 layerstransfer motor5.5kw*2=11kw    Variable frequency drive
Heating area12 sections*2000mm =24000mmHeating blower motor7.5*6+5.5kw*6=78kw
Cooling area1 section*2500mm=2500mmCooling fan motor3kw*1=3kw
Head-in area3000mmtransmission speed1-30m/minute
Tail out area (Natural cooling)4000mmHeating mediumThermal oil/Steam
Radiator12 sets(length2000mm*width 400mm * height 900mm)Drying temperature160-190℃
Drying thickness1-4mmHeat energy consumption1.2 million kcal/steam 2T
Veneer Initial moisture content-60%Roller spacing231mm(edge to edge)  
Veneer final moisture content10%±2%Roller diameter102mm
Drying capacity1.5-2 cbm/hourRoller numbers410 pcs
Blow pipelength 3100*width 200*height 180mmBlow pipes Numbers320 pcs
Weight42000 kg
DimensionLength 33.5m (head 3m + body 26.5m + tail 4m) * width 4.5m * height 2.8m
RemarksMainly for drying thick core(1.2mm-3.5mm or 4mm/5mm/6mm the effect is better Can be customized by customer’s requirement


Other Related Machine 


Spindle-less Log DebarkerSpindless Veneer Peeling Machine | Automatic Veneer Stacker 


Packaging & Delivery


For woodworking machine packaging,usually packing in loose with steel wire rope reinforcement.

Delivery time:10-30days after receiving the deposit.


Service

1). 1 year’s warranty and service lifetime

2). Strictly quality control and machine testing before loading

3). Support customization according to customer requirements

4). Support online technical guidance, training

5). Dispatching technical engineers to install, guide and debug equipment is available

Send Message